Waste Heat Recovery System in cement plant

Picture1

Economical Running Cost

  • Approximately Operation Cost = INR0.5/kWh
  • No Fuel Required but Waste Gas from Production Process Considerable Electricity Cost Saving

Immune to Energy Price Fluctuation

  • Steady in Cost and Supply of Electricity

Environmentally Compatible

  • CO2 Emission Reduction

TECHNICAL APPLICABILITY

  • Availability of Waste Heat> Production capacity > 3000tpd (with PH and AQC boiler)
  • Grate type cooler
  • Availability of abundant Water for boiler and cooling system